Fermi Site Office CX Determinations Determination Date Name of Action: Description Categorical Exclusion Number 6/2/2022 NEPA EENF for Mahoney Creek Floodplain Construction B1.33, B2.5 6/2/2022 Mahoney Creek Stormwater Detention Basin CX B1.33, B2.5 3/23/2022 National Environmental Policy Act Determination at Fermi National Accelerator Laboratory – Nevis Blocks Removal B1.10; B1.30 1/20/2022 NEPA EENF for LBNF Far Site Process WW for Underground Discharge B1.6 1/20/2022 LBNF Far Site Process Wastewater for Underground Discharge B1.6 11/3/2021 National Environmental Policy Act Determination at Fermi National Accelerator Laboratory –Surface Soil Sampling of Proposed Mahoney Creek Floodplain Mitigation Area B3.1 9/22/2021 Fermilab Welcome and Access Center (FWAC) B1.15 8/10/2021 Geotechnical Investigation of Proposed Mahoney Creek Floodplain Mitigation Area B3.1 3/30/2021 National Environmental Policy Act Determination at Fermi National Accelerator Laboratory-Target System Integration Building B1.15 2/24/2021 Utilities Infrastructure Project CX at Fermilab B1.15, B1.16, B1.18, B2.5, B4.11, B5.4 1 2 3 4 5 ... 8