Fermi Site Office CX Determinations
Determination Date | Name of Action: Description | Categorical Exclusion Number |
---|---|---|
10/13/2020 | Target System Integration Building | B1.15 |
9/14/2020 | N-Center Exploratory Excavation | B1.10, B1.24, B1.27 |
5/24/2018 | 2018 Fermilab Site Demolitions CX | B1.16, B1.23 |
3/15/2018 | Monitoring Well and Piezometer Installation for the Booster Neutrino Beam CX | B3.1 |
3/8/2018 | Booster Neutrino Beam Berm Cover | B1.15 |
1/24/2018 | Operations Efforts Toward a 1 MW Proton Beam at NuMI | B3.6 |
12/21/2017 | Geotechnical Investigation for Proton Improvement Plan II (PIP-II) CX | B3.1 |
10/31/2017 | Demolition of Horse Barn (Site 56) Structures CX | B1.16; B1.23 |
10/10/2017 | Demolition of Lab 8 Structures CX | B1.16; B1.23 |
3/16/2017 | NEPA Categorical Exclusion: Introduction of Eastern Prairie Fringed Orchid at Fermilab | B1.20; B2.5; B3.1; B3.3; B3.8 |