Fermi Site Office CX Determinations

Determination Date Name of Action: Description Categorical Exclusion Number
10/13/2020 Target System Integration Building B1.15
9/14/2020 N-Center Exploratory Excavation B1.10, B1.24, B1.27
5/24/2018 2018 Fermilab Site Demolitions CX B1.16, B1.23
3/15/2018 Monitoring Well and Piezometer Installation for the Booster Neutrino Beam CX B3.1
3/8/2018 Booster Neutrino Beam Berm Cover B1.15
1/24/2018 Operations Efforts Toward a 1 MW Proton Beam at NuMI B3.6
12/21/2017 Geotechnical Investigation for Proton Improvement Plan II (PIP-II) CX B3.1
10/31/2017 Demolition of Horse Barn (Site 56) Structures CX B1.16; B1.23
10/10/2017 Demolition of Lab 8 Structures CX B1.16; B1.23
3/16/2017 NEPA Categorical Exclusion: Introduction of Eastern Prairie Fringed Orchid at Fermilab B1.20; B2.5; B3.1; B3.3; B3.8